Control systems in the process industry - Electrical and instrumentation loop check
Subscribe on standards with our subscription service. When you use our service you can be assured the latest editions and easy access.
Read more about SIS Subscriptions
IEC 62382:2012 describes the steps recommended to complete a loop check, which comprises the activities between the completion of the loop construction (including installation and point-to-point checks) and the start-up of cold commissioning. This standard is applicable for the construction of new plants and for expansion/retrofits (i.e. revamping) of E&I installations in existing plants (including PLC, BAS, DCS, panel-mounted and field instrumentation). This second edition cancels and replaces the first edition published in 2006 and constitutes a technical revision. The main changes with respect to the previous edition are: The definition of the documents mentioned in the standards is in accordance with IEC 62708: Documents for Electrical and Instrumentation Projects in the Process Industry. Subclause 6.3 has been revised.
Control systems in the process industry - Electrical and instrumentation loop check
Subscribe on standards with our subscription service. When you use our service you can be assured the latest editions and easy access.
Read more about SIS Subscriptions