1.1 This practice covers a process for the assessment and reporting of an entitys overall equipment management process maturity (EMPM).1.2 The highest value is placed on continuous improvement as reflected in measured increases in maturity over time.1.3 The EMPM model is designed to be applicable and appropriate for all equipment-holding entities, however, the EMPM may not be the only acceptable assessment model available.1.4 It includes all aspects of equipment managemen